top of page

Columbia Village Apartments

Project Manager: Scott Sumner, PE

Project Owner: Washington State University
Project Location: Pullman, WA
Design: 2023-2024

Construction: 2024

SynTier Engineering provided the civil engineering services for ramp/sidewalk improvements associated with the ADA and stormwater drainage Improvements project. Services include the design for sidewalk, drainage, and stair improvements throughout the Columbia Village Apartments. 

​

As we lifted the sidewalk, we encroach on the 7'6" requirement for access to the apartment doors. SynTier worked with the Contractor and WSU to come up with a solution.

bottom of page