
Taylor Sports Complex
Project Manager: Scott Sumner, PE
Project Owner: Washington State University
Project Location: Pullman, WA
Design: 2023-2024
Construction: 2023-2025
The Taylor Sports Complex is a project that encompasses a majority of SynTier’s services. SynTier, through WSU, performed the topographic survey. The survey combined existing information from the adjacent site, Bailey Brayton Baseball field, record As-built drawings, field collected topographic information, and GIS information provided by WSU.
SynTier was the Civil Engineer for the Taylor Sports Complex design-build project. SynTier was responsible for the site and utility design for the project. The project consisted of the removal of “The Bubble” and replacing it with a permanent structure. This new building required improvements to the water, sewer, and stormwater utilities. Site access and grading was also included in the design to provide accessible access to the building.




