Paradise Hills Subdivision
Project Manager: Scott Sumner, PE
Project Owner: Pullman Development Group
Project Location: Pullman, WA
Design: 2017-2022
Construction: 2018-2024
Paradise Hills Subdivision is a 75-lot multi-phase development in the Military Hill neighborhood of Northwest Pullman, WA. The project included the coordination of construction for the the new Kamiak Elementary School. Scott Sumner, PE provided project management and coordination with the various contractors and design team of Kamiak Elementary as well as the stormwater quality and quantity treatment analysis and design. Scott also assisted with the road design and mass grading. During construction, SynTier was responsible for inspections by our Certified Erosion and Sediment Control Lead (CESCL), construction coordination between the subdivision contractor and the City of Pullman, Whitman County, Pullman School District, the School District contractor, architect, and engineers.
SynTier Engineering has performed modifications and design services for the last two phases of the development. This required SynTier to provide the permitting, analysis, design, construction inspection, and as-builts for construction of the ponds to meet all construction documents.