top of page

Cottages at the
Aquatic Center
Project Manager: Scott Sumner, PE
Project Owner: Mitch Dimke
Project Location: Clarkston, WA
Design: 2019-2020
Construction: 2020-2021
SynTier Engineering started design of this subdivision in 2019. The Subdivision was created for single-family residential development. The layout consisted of 59 homes over 7+ acres. Scott Sumner, PE was the primary PM, and led a team of engineers, drafting technicians, and surveyors. The team provided the Civil Engineering design for the project, including stormwater design of the infiltration facilities and overflow structures. SynTier also provided grading quantity calculations and verification utilizing aerial drones and conventional survey techniques.