Fairmont Estates Subdivision
Project Manager: Ross Anderson, PE
Project Owner: Summit Properties
Project Location: Spokane Valley, WA
Design: 2020-2024
Construction: 2021-Present
This project for SynTier includes 73 single-family housing lots on the Southeast side of Spokane Valley. This is a subdivision project that has been broken into three phases of 27, 29 and 17 units per phase. Each phase of the project will include site grading and erosion control, roadway-, stormwater-, utility-design and pedestrian ADA access. Stormwater analysis has determined the need for infiltration treatment requirements and construction of two onsite stormwater pond systems.
SynTier will provide grading and drainage design, coupled with earthwork analysis for the entirety of the project. This allows for seamless transition from phase to phase, saving time and money throughout construction of this project. SynTier will also play a vital role in providing construction assistance from start to finish on this project, ensuring client needs are being met and construction timelines are on track.